Summary
Read the original submission for the full text.
Argues that AI could accelerate Australia's decarbonisation and recommends a coordinated national plan directing AI and advanced modelling to that end, including capacity for regional and community organisations. An appended Senate inquiry submission addresses data centres' energy, water, siting and community benefit, with recommendations including mandatory efficiency standards.
Key points
Quotes are the submitter’s own words. Text taken from documents, including scanned pages read by text-recognition software, can differ from the PDF. Check the original. Listed in the same order as on the submission’s page in the interactive guide.
Describes AI's potential to accelerate Australia's climate transition as an opportunity missing from the national conversation and lacking a coordinated plan.
We raise one opportunity that sits squarely within that remit but is not yet part of the national conversation: the potential for AI to accelerate Australia's climate transition, and the current absence of a coordinated plan to realise it.
States that agencies including AEMO and CSIRO already apply AI to energy, water and climate tasks.
Government and energy agencies are already using AI to support Australia’s transition to net zero. The Australian Energy Market Operator (AEMO) uses machine learning for long-term electricity demand forecasting (AEMO 2024). CSIRO applies AI to real-time water forecasting and carbon ecosystem mapping (Naughtin et al. 2025).
Describes its LUTO2 advanced land-use modelling capability alongside AI as illustrating the potential of narrow, domain-specific models trained on Australian data.
Advanced modelling capabilities alongside AI, such as Climateworks' own Land Use Trade-Offs model version 2 (LUTO2), developed with Deakin University and with research inputs from CSIRO, illustrate the potential of narrow, domain-specific, Australian-data-trained models described in paragraph (f) of the terms of reference (Climateworks Centre 2024).
Argues that standards managing AI risks are only half the equation and that AI's capability should also be directed toward the public good, including decarbonisation.
But Standards that manage AI's risks are only half of the equation. Without an accompanying plan to actively direct AI's capability toward the public good, including decarbonisation, this opportunity risks being left to chance rather than built in by design.
Recommends building local and state government, Indigenous and community organisation, research institute, and regional and rural community capacity to apply AI to climate challenges and adaptation.
invest in the capacity of local and state governments, Indigenous and community organisations, research institutes, and regional and rural communities to apply AI tools to climate challenges and adaptation – ensuring the benefits of this capability reach beyond major cities and large technology firms.
In its appended Senate submission, recommends mandatory energy and water efficiency standards for data centres benchmarked to a 6-star NABERS rating.
Set mandatory energy and water efficiency standards for data centres, with a 6-star National Australian Built Environment Rating System (NABERS) rating as the benchmark, to minimise demand growth.
Recommendations
Recommendations are shown beside the submission’s own words. Listed in the same order as on its page in the interactive guide.
Develop a coordinated national plan directing AI and advanced modelling toward faster economy-wide decarbonisation, building on and extending the National AI Plan.
Climateworks recommends the Committee’s report call on the government to develop a coordinated national plan to direct AI and advanced modelling toward accelerating decarbonisation across the economy – building on and extending the ambition of the National AI Plan (DISR 2025).
Such a plan could embed AI applications in existing sector emissions reduction plans and the national climate risk assessment framework, rather than a separate workstream.
embed AI applications into Australia’s existing sector emissions reduction plans and national climate risk assessment framework, which has already identified 63 nationally significant risks (Australian Climate Service 2025) – rather than treating this as a separate workstream
Such a plan could strengthen government-agency collaboration on AI decarbonisation applications in energy and electricity, buildings, transport, industry and land use.
Strengthened collaboration between government agencies on AI applications for decarbonisation, including the energy and electricity, buildings, transport, industry and land use sectors.
Such a plan could invest in the capacity of local and state governments, Indigenous and community organisations, research institutes, rural and regional communities and land managers to apply AI to climate challenges and adaptation.
Investment in the capacity of entities, such as local and state governments, Indigenous and community organisations, research institutes, rural and regional communities and land managers to apply AI tools to climate challenges and adaptation.
In the appended Senate submission: expect or require data centre operators, AI companies and their investors to use the Sustainable Finance Roadmap tools, including credible transition plans.
Expect or require data centre operators, AI companies and their investors to use the tools in the Sustainable Finance Roadmap, including credible transition plans.
In the appended Senate submission: consider influencing or requiring credible AI-company and data-centre transition plans irrespective of current statutory obligations.
Climateworks recommends that the Committee propose that the government consider how it could influence or require AI companies and data centre operators to adopt credible transition plans, irrespective of their current statutory obligations.
In the appended Senate submission: where AI companies or data-centre operators enter formal government agreements, including MoUs or procurement, expect companies and investors to adopt credible transition plans on an ‘if not why not’ basis.
Where AI companies or data centre operators enter into formal agreements with the government, it is appropriate to expect high corporate standards. These agreements, which could include Memorandums of Understanding (MoU) to deliver the National AI Plan (DISR 2025) or arrangements in which the government is the customer, could be leveraged to expect companies and investors to adopt credible transition plans on an ‘if not why not’ basis.
In the appended Senate submission: where AI companies or data-centre operators lack formal government agreements but need regulatory approval, incorporate transition-plan expectations into developer Expectations and continue prioritising genuinely committed developments.
Where AI companies or data centre operators do not have a formal agreement with government, but require regulatory approval to proceed, such as foreign investment or grid connection approval, the expectation that they adopt credible transition plans could be incorporated in the government’s Expectations of data centres and AI infrastructure developers (DISR 2026). The government could then continue, as it does now, to prioritise approvals for developments that demonstrate a genuine commitment to that framework.
In the appended Senate submission: require AI-company and data-centre transition plans to address social and nature outcomes, including water supply, land use and host communities, consistently with government guidance.
The content of their credible transition plans need not be limited to climate outcomes. Treasury’s recent consultation on its upcoming Climate-related Transition Planning Guidance suggests it will adopt a ‘climate first but not only’ principle, supporting the inclusion of social and nature outcomes in credible transition plans alongside climate (Treasury 2025). This is relevant to data centres, which can also have significant impacts on water supply, land use and host communities. Climateworks suggests that credible transition plans prepared by data centre operators and AI companies be required to reflect these considerations, consistent with the government's own guidance.
In the appended Senate submission: extend transition-plan expectations to investors and financiers, signalling that plans could be an investment criterion.
Finally, the inquiry has an opportunity to extend the expectation for credible transition plans beyond AI companies and data centre operators, signalling to the investors and financiers backing these facilities that they could treat such plans as a criterion for investment.
In the appended Senate submission: consider extending developer Expectations and formal agreements, building on federal environmental-data investments, potentially through technical collaboration with Australian public research institutions to co-develop climate AI.
How the government’s Expectations of data centres and AI infrastructure developers, and any formal agreements forged with them, could be extended, building on recent federal budget investments to modernise environmental data and digital systems through AI (DISR 2026). Specifically, this could include technical collaboration with Australian public research institutions to co-develop AI applications for climate purposes.
In the appended Senate submission: assess data-centre demand alongside transport, building and industry demand, system capacity, demand flexibility and additional renewable supply, to protect the energy transition.
Ensure data centres do not slow the energy transition by assessing how much additional demand the electricity system can accommodate alongside the increasing demand from transport, buildings and industry and how data centres can contribute through demand flexibility and additional renewable energy supply.
In the appended Senate submission: have governments and energy-market bodies assess additional electricity demand and system capacity by location and timeframe.
Governments and energy market bodies therefore need to carefully assess how much additional electricity demand will be placed on the system, as well as how much it can accommodate, where, and over what timeframe.
In the appended Senate submission: require renewable-only data-centre on-site generation/storage and PPAs; match grid consumption with renewable facilities built within CER-set timing balancing additionality and long-term offtake certainty, certified by Renewable Electricity Guarantee of Origin Scheme.
Data centres can source their electricity either from on-site generation and storage, through power purchase agreements (PPAs) or from the wholesale market. Climateworks suggests: ● Where electricity is sourced on-site, require that generation and storage infrastructure be renewables only. ● Where electricity is sourced through a PPA, require that agreements are for renewable electricity only. ● Where electricity is sourced from the grid, require consumption be matched with electricity from renewable facilities constructed within an appropriate timeframe determined by the CER. The timeframe would balance additionality with the long-term offtake certainty that renewable developers need to reach financial close. Matching would be certified through the Renewable Electricity Guarantee of Origin Scheme (CER 2026).
In the appended Senate submission: apply the renewable-electricity sourcing requirement economy-wide.
A requirement for data centres to source their electricity from renewables raises the question of why such an obligation should apply to data centres and not other industrial and commercial users. Climateworks would support applying the same requirement across the economy.
In the appended Senate submission: require existing data centres with diesel backup to transition to renewable alternatives within a defined timeframe through planning, licensing or legislation; require disclosure of sector-wide diesel backup infrastructure.
We note that some existing data centres, including the NextDC facility in Melbourne’s inner west (Lucas 2026), have installed on-site diesel backup generators. This is inconsistent with Australia’s net zero objectives. Climateworks suggests that planning approvals, licensing conditions, or specific legislative obligations require those facilities to transition to renewable backup alternatives, consistent with the requirements set out above and within a defined timeframe. Furthermore, the full extent of diesel backup infrastructure across the sector is not publicly reported and warrants disclosure requirements.
In the appended Senate submission: assess data centres' capacity to provide demand flexibility services, and the market settings that would best incentivise their participation, taking into account differences between the NEM and WEM.
Assess data centres' capacity to provide demand flexibility services, and the market settings that would best incentivise their participation, taking into account the differences between the NEM and WEM.
In the appended Senate submission: governments analyse data centres' capacity for demand flexibility and consider formally requiring them to participate and to install the necessary technologies.
Governments analyse the capacity of data centres to contribute to demand flexibility, and consider formally requiring them to participate and to install the necessary technologies.
In the appended Senate submission: have governments and market bodies design tariffs, market access and system planning to incentivise demand flexibility.
Governments and market bodies ensure tariffs, market access and system planning are designed to incentivise participation in demand flexibility.
In the appended Senate submission: the AEMC and AEMO assess the WDRM and IPRR settings to optimise data centre participation in the wholesale market.
The AEMC and AEMO assess the settings of the WDRM and IPRR frameworks to ensure they optimise data centre participation in the wholesale market through demand flexibility.
In the appended Senate submission: Energy Policy WA and AEMO consider how the Reserve Capacity Mechanism can best incentivise data centre demand flexibility in the WEM.
Energy Policy WA and AEMO consider how the RCM can best incentivise data centre demand flexibility in the WEM.
In the appended Senate submission: require new data centres to meet 6-star NABERS ratings under both energy and water frameworks, potentially regulated through planning approvals.
Climateworks recommends that new data centres be required to meet a 6-star NABERS rating under both the energy and water frameworks. The 6-star standard is achievable, is already incorporated into government policy, and can be regulated through planning approvals.
In the appended Senate submission: include data centres in the National Energy Performance Strategy and further energy-performance policies in updates.
Climateworks also supports the inclusion of data centres in the National Energy Performance Strategy, and any further policies designed to improve their energy performance in updates to that strategy (DCCEEW 2024a).
In the appended Senate submission: explore how clearer incentives and information about where to build data centres could guide investment towards regions with spare capacity and grid connection infrastructure.
Explore how clearer incentives and information about where to build data centres could guide investment towards regions that have spare capacity and grid connection infrastructure.
In the appended Senate submission: AEMO or state governments publish up-to-date information on network capacity, connection timeframes and renewable availability by region, with guidance for data centre connections.
AEMO or state governments publish up-to-date information on network capacity, connection timeframes and renewable energy availability in different regions, with specific guidance for data centre connections.
In the appended Senate submission: state governments develop Industrial Area Energy Plans for key industrial regions and use them to identify where data centres can be co-located with industrial facilities undergoing electrification.
State governments develop IAEPs for key industrial regions and use them to identify where data centres can be co-located with industrial facilities undergoing electrification.
In the appended Senate submission: have energy governance bodies and state governments ensure connection processes and pricing reflect large loads' costs, benefits and wider-system impacts.
Energy governance bodies and state governments ensure network connection processes and pricing reflect the costs and benefits of large new loads and account for their impact on the wider system.
In the appended Senate submission: incorporate locational guidance into federal developer Expectations and MoUs; design locational measures consistently with land-use trade-offs, balancing energy infrastructure with biodiversity, agriculture, water and heritage.
The federal government incorporates locational guidance into its Expectations of data centres and AI infrastructure developers (DISR 2026) and any MoUs entered into with data centre operators and AI companies to deliver the National AI Plan (DISR 2025). These measures would be best designed in a way that is consistent with the land-use trade-off considerations outlined in Recommendation 7, ensuring locational guidance balances energy infrastructure against biodiversity, agriculture, water and heritage requirements (Climateworks Centre 2025).
In the appended Senate submission: support the AEMC draft decision improving NEM access standards for large loads such as data centres.
More broadly, Climateworks supports the AEMC draft decision to improve the NEM access standards for large loads such as data centres (AEMC 2026), which would establish clearer technical connection requirements and help to improve system security and keep costs down for consumers.
In the appended Senate submission: coordinate data-centre and supporting energy-infrastructure siting with government land-use planning, using biodiversity, agricultural, water, cultural, industrial and community information, towards a national land-use framework.
Coordinate the siting of data centres and their supporting energy infrastructure with government land-use planning, so that the best available information on biodiversity, agricultural, water, cultural, industrial and community values shapes decisions, with a view to a comprehensive national land-use framework over time.
In the appended Senate submission: have AEMO and government work together so the best available land-use information shapes energy-infrastructure siting decisions.
Climateworks recommends that AEMO and government work together so the best available land-use information shapes energy infrastructure siting decisions
In the appended Senate submission: establish a national land-use framework coordinating sectors and jurisdictions and climate, biodiversity, agriculture, water, community and energy needs through shared evidence, without directing individual land-use decisions.
In its Australia's Land Use Future report, Climateworks supports establishing a national land-use framework that delivers greater coherence in how the nation plans for landscape change. Such a framework could coordinate policy and planning across sectors and jurisdictions and integrate climate, biodiversity, agriculture, water, community and energy requirements. It would not seek to direct individual land use decisions. It would instead establish a shared evidence base that clarifies the trade-offs Australia faces and supports more coordinated decision-making (Climateworks Centre 2026).
In the appended Senate submission: integrate data-centre growth into precinct planning and operations, requiring new and existing developments to safeguard climate/environmental integrity, consult genuinely and deliver tangible benefits for households, local industries and impacted communities.
Integrate data centre growth into both strategic precinct-level planning and operational frameworks, ensuring that new and existing developments safeguard climate and environmental integrity, undertake genuine community consultation, and deliver tangible benefits for households, local industries and impacted communities.
In the appended Senate submission: require metropolitan consultation on heat, noise and infrastructure; consider benefit-sharing through Voluntary Planning Agreements, potentially co-funding local renewables/storage or e-waste recycling.
In metropolitan areas, it means planning conditions that require consultation to genuinely address suburban liveability concerns, including heat, noise and cumulative strain on public infrastructure. Rather than adding regulatory delays, benefit-sharing can be integrated through negotiated arrangements such as Voluntary Planning Agreements. This could involve co-funding local renewable energy and battery storage to protect households from peak-demand price spikes, or funding local e-waste programs to prevent critical minerals from entering landfill, and recycling them back into the economy.
In the appended Senate submission: engage regional communities on data-centre and energy-infrastructure footprints, co-designing agriculture/biodiversity safeguards; where catchments face pressure and developments add utility demand, consider developer contributions for water upgrades or net-zero cooling.
In regional areas, it means deep community engagement on the spatial footprint of data centres and any dedicated energy infrastructure, with co-design processes that safeguard critical agriculture and biodiversity. Where data centres put pressure on water catchments, governments can use developer contribution agreements, which already apply where a new development places additional demand on public utility infrastructure, to fund upgrades to local water infrastructure or net zero water cooling technologies.
In the appended Senate submission: establish funded local TAFE and university training pipelines through transition plans, providing skills and employment pathways in AI and data-centre infrastructure.
Across both contexts, establishing funded training pipelines with local TAFEs and universities, captured through credible transition plans, would provide residents with genuine skills and employment pathways into the AI and data centre infrastructure sectors.
In the appended Senate submission: for underway developments with limited redesign scope, use operational/utility conditions for resource mitigation and local benefits, potentially reporting, liaison and benefit-sharing triggered by expansions/compliance reviews, ideally without reopening original approvals.
For developments already underway, where there is limited scope to alter site design or location, operational and utility conditions can ensure data centre operators mitigate cumulative resource strain while delivering socio-economic benefits to impacted communities. This could take the form of ongoing reporting, community liaison, and incentivised benefit-sharing frameworks triggered by subsequent capacity expansions or environmental compliance reviews, ideally fostering accountability and local benefit without reopening the original planning approval itself.
In the appended Senate submission: consider how state planning mechanisms such as SSDs could require data centre developers to demonstrate genuine community consultation and deliver tangible benefits as a condition of approval.
Consider how state planning and assessment mechanisms, such as SSDs, could be used to require data centre developers to demonstrate genuine community consultation and deliver tangible benefits as a condition of approval.
In the appended Senate submission: consider using the Treasurer's strengthened 2026 conditioning powers to incorporate consultation and community-benefit commitments into FIRB approvals for data-centre and AI-infrastructure investments.
Consider whether the Treasurer's strengthened conditioning powers under the 2026 foreign investment reforms could be used to incorporate community benefit and consultation commitments into FIRB approvals for data centre and AI infrastructure investments.
In the appended Senate submission: develop urban and regional consultation guidance aligned with the Developer Rating Scheme, including minimum engagement standards, anticipated-impact disclosure and ongoing community input during operations.
Develop clear guidance on what meaningful community consultation looks like for data centre developers in both urban and regional contexts, aligned with the principles of the Developer Rating Scheme used for renewable energy infrastructure, including minimum standards for engagement, disclosure of anticipated impacts, and mechanisms for ongoing community input during operations (DCCEEW 2026b).
In the appended Senate submission: require developers' credible transition plans to demonstrate host-community socio-economic, climate and nature benefits, including local renewable/storage co-investment, water infrastructure or efficiency, and local employment/skills pathways.
Require data centre developers to demonstrate, through credible transition plans, how developments will deliver tangible socio-economic, climate and nature benefits to host communities, including through co-investment in local renewable energy and storage, water infrastructure or efficiency measures, and local employment and skills pathways.
In the appended Senate submission: work with states and territories through the Energy and Climate Change Ministerial Council on consistent consultation and benefit standards, recognising different development scales and planning regimes.
Work with states and territories through the Energy and Climate Change Ministerial Council to ensure community benefit and consultation standards are consistent across jurisdictions, recognising that data centre development occurs at different scales and under different planning regimes across Australia.