Require large data centres to provide demand response, storage or firming
3 submissions. Each submission counts once for this shared ask. Counts do not measure importance or merit.
A shared ask groups requests for substantially the same action from three or more submissions when the group was created. Groups remain listed if withdrawals reduce their counts. AI models summarised recommendations, grouped them and checked the groups. The label summarises the requests; it is not a quote. A shared ask does not mean agreement on anything else.
Theme: Data centre energy demand
Recommendations from submissions
Quotes are the submitter’s own words. Text taken from documents, including scanned pages read by text-recognition software, can differ from the PDF. Check the original. Extracts are chosen by an AI model. Submissions are listed in submission number order; recommendations follow their order on each submission’s page.
Kingston AI Group Submission 199
Appendix A: condition grid connection on genuinely additional renewable generation and firming, using predictable data-centre demand to finance clean energy.
5. Use predictable data-centre demand to finance new renewable generation. Condition grid connection on genuinely new (additional) renewable generation and firming, so the large, predictable demand data centres represent underwrites the clean generation the grid needs as coal retire.
Economics with Heart Submission 568
Have large data centres register on-site storage and curtailable load as demand response, available during reserve shortfalls, including overnight.
Large data centres register on-site storage and curtailable load as demand response, available during reserve shortfalls, including overnight.
Climate Council Submission 571
Require data centres to contract with, or install, new firming capacity that is in the grid from day one of operations.
Data centres must be required to contract with (or install) new firming capacity that is in the grid from day one of operations.