Require data centres to pay the full cost of infrastructure they need
8 submissions. Each submission counts once for this shared ask. Counts do not measure importance or merit.
A shared ask groups requests for substantially the same action from three or more submissions when the group was created. Groups remain listed if withdrawals reduce their counts. AI models summarised recommendations, grouped them and checked the groups. The label summarises the requests; it is not a quote. A shared ask does not mean agreement on anything else.
Theme: Data centre energy demand
Recommendations from submissions
Quotes are the submitter’s own words. Text taken from documents, including scanned pages read by text-recognition software, can differ from the PDF. Check the original. Extracts are chosen by an AI model. Submissions are listed in submission number order; recommendations follow their order on each submission’s page.
Parents for Climate Submission 127
Require all future data centres to pay for the energy and water infrastructure they need so households do not incur extra transmission, distribution or supply costs.
All future data centres in Australia must be required to pay for the energy and water infrastructure they need so households do not incur extra transmission, distribution or supply costs.
Australian Fusion Industry Submission 150
Ensure data centre proponents fund attributable electricity, water production and security, communications and transport upgrades without avoidable costs falling on households, small businesses, agriculture or existing regional industries.
Ensure that data centre proponents fund attributable electricity, water production and security, communications and transport upgrades and do not transfer avoidable costs to households, small businesses, agriculture, or existing regional industries.
Business Council of Australia (BCA) Submission 290
Require connecting data centres to pay the efficient, incremental and independently attributable costs of connection and upstream network augmentation they trigger, subject to regulatory oversight, while enabling private investment in shared assets.
require connecting data centres to pay the efficient, incremental and independently attributable costs of their connection and any upstream network augmentation they trigger, subject to regulatory oversight, while enabling private investment in shared assets
Mr Noah Quinlan Submission 365
Require large AI facilities to bear the full incremental cost of the power, water, network and other infrastructure they require, and consider requiring own additional power and water capacity where practicable.
Require large AI facilities to bear the full incremental cost of the power, water, network and other enabling infrastructure they require, and consider the People First principle that such facilities should provide their own additional power and water capacity where practicable.
Name withheld Submission 380
AI companies must also pay 100% of the cost of any infrastructure upgrades required for their operations, including transmission lines, substations, water pipelines, and roadworks.
Mrs Natalia Glowinska Submission 391
Make companies pay the full cost of extra power, water and other infrastructure.
Make the companies pay the full cost of any extra power sources and lines, water pipes or other infrastructure they need. Ordinary households should not subsidise them through higher bills.
Mr Hugh McFarlane Submission 426
Require data centre investors to fund wraparound infrastructure: renewable generation at least matching consumption, grid connectivity, low-impact cooling and new water infrastructure where necessary, alongside adequate community consultation.
We can make deliberate choices to ensure data centres are built correctly and deployed with adequate community consultation. This includes requiring investors to pay for the necessary wraparound infrastructure. The amount of investment capital pouring into data centres is clear evidence that investors have the funds to cover this additional infrastructure, including renewable energy generation to contribute at least as much power to the grid as consumed, as well as grid connectivity, low-impact cooling systems and new water infrastructure where necessary.
Economics with Heart Submission 568
Require large data centres connecting to the SWIS to pay the full capacity and network augmentation costs they trigger, so these are not passed to households and regional businesses.
Large data centres connecting to the SWIS pay the full capacity and network augmentation costs they trigger, so these are not passed to households and regional businesses.