An unofficial, independent guide to the public records of the Joint Select Committee on Artificial Intelligence. Not connected with the Parliament of Australia or the committee. Its makers also made a submission (no. 481; see About). Summaries and scores are written by AI and can be wrong: check the original before relying on them.

Require data centres to be powered by renewable energy

10 submissions. Each submission counts once for this shared ask. Counts do not measure importance or merit.

A shared ask groups requests for substantially the same action from three or more submissions when the group was created. Groups remain listed if withdrawals reduce their counts. AI models summarised recommendations, grouped them and checked the groups. The label summarises the requests; it is not a quote. A shared ask does not mean agreement on anything else.

Theme: Data centre energy demand

Recommendations from submissions

Quotes are the submitter’s own words. Text taken from documents, including scanned pages read by text-recognition software, can differ from the PDF. Check the original. Extracts are chosen by an AI model. Submissions are listed in submission number order; recommendations follow their order on each submission’s page.

  1. Australian Local Government Association (ALGA) Submission 29

    1. Require renewable-powered data centres to protect households from electricity disruption, avoid higher energy costs and keep emissions falling.

      Require data centres to be powered by renewable energy, so that households are protected from electricity disruption, energy costs do not rise and emissions continue to fall.

  2. Climateworks Centre Submission 41

    1. In the appended Senate submission: require renewable-only data-centre on-site generation/storage and PPAs; match grid consumption with renewable facilities built within CER-set timing balancing additionality and long-term offtake certainty, certified by Renewable Electricity Guarantee of Origin Scheme.

      Data centres can source their electricity either from on-site generation and storage, through power purchase agreements (PPAs) or from the wholesale market. Climateworks suggests: ● Where electricity is sourced on-site, require that generation and storage infrastructure be renewables only. ● Where electricity is sourced through a PPA, require that agreements are for renewable electricity only. ● Where electricity is sourced from the grid, require consumption be matched with electricity from renewable facilities constructed within an appropriate timeframe determined by the CER. The timeframe would balance additionality with the long-term offtake certainty that renewable developers need to reach financial close. Matching would be certified through the Renewable Electricity Guarantee of Origin Scheme (CER 2026).

  3. Australian Academy of Technological Sciences and Engineering Submission 90

    1. Require new data centres to underwrite additional renewable electricity generation and storage capacity.

      Require new data centres to underwrite additional renewable electricity generation and storage capacity, to support increased electricity demand and accelerate the deployment of renewable energy.

  4. Parents for Climate Submission 127

    1. Require data centre proposals to include detailed, costed plans to source enough additional renewable energy and firming capacity to match their needs (in state, hourly matching), without relying on offsets.

      All data centre proposals must include detailed, costed plans to source enough additional renewable energy and firming capacity to match their own needs (in state and with hourly matching), without relying on offsets.

  5. Dr Fiona Tito Wheatland Submission 245

    1. In the attached Senate submission, require AI developments to provide their own renewable, non-fossil-fuel energy as a condition of operating in Australia.

      It took the Prime Minister less than a few weeks to alter his stand that all AI developments would be required to generate their own energy through renewable sources. Allowing these systems to have access to the electricity grid undoes all the work done by citizens to reduce our society’s energy carbon footprint. I believe that this change is wrong and that the Government must require these organisations to provide their own renewable non-fossil fuel energy sources and this should be a condition of operating here.

  6. Australian Council of Trade Unions (ACTU) Submission 282

    1. Require all data centre projects to produce or procure new renewable energy generation equivalent to a minimum 110% of their facility's forecast energy demand.

      Require that all DC projects should produce or procure new renewable energy generation equivalent to a minimum 110% of their facility’s forecast energy demand.

  7. Mr Paul Schnackenburg Submission 389

    1. Require by law that every new data centre (AI or not) be powered by 100% renewable energy.

      Every new datacentre (AI or not) needs to be powered by 100% renewable energy by law.

  8. Ms Heidi James Submission 436

    1. Require new data centres to demonstrate additional, reliable renewable generation without increasing reliance on coal and gas.

      That new data centres be required to demonstrate access to additional, reliable renewable energy generation and not increase Australia's reliance on coal and gas.

  9. Ms Jo Grant Submission 476

    1. Require data centres in Australia to be powered by renewable energy in perpetuity.

      Data centres in Australia must be powered by renewable energy in perpetuity;

  10. Climate Council Submission 571

    1. Require data centres and customers with total demand ≥30 MW to contract pre-FID renewable generation matching at least 100% of demand before operations begin.

      Data centres and their customers with total energy demand of 30 MW or greater must be required to enter into long-term contracts, such as power purchase agreements (PPAs), with pre-FID renewable generation projects to match no less than 100% of their demand, before they can commence operations.